Through time concrete walls, beams or floors will have cracks and this is not to be taken lightly. Concrete services experts would always remind property owners that cracks are tell-tale signs of structural problem. The early remedy or solution would prevent more expenses and once done would assure the safety of those living in the property.

There are do-it-yourself kits that allow treatment of cracks through epoxy injection. However, epoxy or polyurethane injection to be used would depend on the crack width, wall thickness, presence of water, cold environment and other conditions. How much time the injection needs to set is also determined by such conditions.

Here are the basic steps that concrete services professionals do with low-pressure crack injection.

1. Installation of injection ports concrete contractors sydney 

Short, hard plastic tubes with a flat base called surface ports would be needed as entry points for the epoxy to get into the crack. Drilling is not a good method since this can cause more damage and cleanup would be needed after. The base of the surface port is going to be situated directly over the crack and bonded to the surface with the epoxy paste. A rule-of-thumb is to place an inch between ports for each inch of wall thickness.

2. Seal the surface

An epoxy adhesive is used to seal over the surface ports and exposed cracks. This paste can cure from 20 to 45 minutes and will be able to surface seal with good bonding under the injection pressures. The entire exposed crack should be covered with paste. The surface port holes should not be sealed.

3. Injecting epoxy into the crack

Concrete services providers would begin injecting the epoxy at the lowest point of the wall until the epoxy will be oozing out of the upper surface ports. This is a sure sign that the crack has been filled up to the highest level. The first port would then be plugged then the next plug would be worked on. The process is repeated until the entire crack has been filled by epoxy.

Next thing is to push the material with a dispensing tool using slow pressure. This reduces the possibility of leaks or blow-outs. The repair material should be given time to fully penetrate the crack.

 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Hitting the Jackpot with Progressive Slot Machines
  • Factors That Influence Your Roof Repair Estimate
  • Concrete Services: Steps in Injection Process
  • Small Business Owners: How Does Your Business Keep Score Towards Profits?
  • Some Reasons Why You Should Be Using Dating Websites to Meet Women

Recent Comments

    Archives

    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020

    Categories

    • Games
    • General
    • Uncategorized

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    ©2021 Wakacyjnapraca | Powered by SuperbThemes & WordPress